EMERGENCY CORRIDOR SAVES LIVES!

On the two-lane roads the emergency corridor is formed by moving the vehicles in the right lane as far as possible to the right and the vehicles in the left lane as far as possible to the left. On three-lane roads, the middle lane is cleared by moving the vehicles in the middle lane as far as possible to the right and by providing access to emergency vehicles.

more info...

Advice for driving on a motorway

|

During summer months, motorway traffic is extremely dense and occasionally there is congestion due to high traffic demand. We appeal to the users due to their safety and safety of other traffic participants to show a high level of responsibility while driving, because, unfortunately, in the last few days, we have witnessed several serious traffic accidents with fatalities.

more info...
ETC packages can be purchased at all Toll Plazas 24/7.
phone info line
+385 1 6504 899

Master Plan

eu p1 1
Project name: Master Plan for the development of transport infrastructure on the Zagreb - Karlovac motorway section as a prerequisite for the development of the region - Feasibility Study preparation
The Agreement on allocation of grants was signed by Autocesta Rijeka Zagreb d.d. with the Ministry of Maritime Affairs, Transport and Infrastructure on 21 November 2014 for the Project: Master Plan for the development of transport infrastructure on the Zagreb - Karlovac motorway section as a prerequisite for the development of the region - Feasibility Study preparation.

"Amendment to the Agreement on allocation of grants" was signed on 10 February 2015 which defined the I phase of the Project implementation, that is the preparation of the Master plan for the development of transport infrastructure on the Zagreb - Karlovac motorway section.

Project Coordinator: Autocesta Rijeka - Zagreb, company for construction and operation of the motorway, Širolina 4, 10 000 Zagreb
Project Partners: Zagrebačka County, Ulica grada Vukovara 72/V, 10000 Zagreb
Town of Karlovac, Ulica Ivana Banjavčića 9, 47000 Karlovac
Town of Jastrebarsko, Strossmayera 13, 10450 Jastrebarsko
Municipality of Klinča Sela, Karlovačka 28E, 10450 Jastrebarsko
Municipality of Stupnik, Gornjostupnička 33, 10255 G. Stupnik
Project Objective: The project aims to prepare a Master Plan for the development of transport infrastructure on the Zagreb - Karlovac motorway section as a basis of sustainable development of the section, as to increase the quality of preparedness of ARZ potential projects for potential financing from the European structural and investment funds for the period 2014 - 2020.
Prepared Master Plan is a strategic document on the basis of which potential ARZ projects will be identified for the purpose of sustainable development of the section, which will include all development guidelines set out in the strategic documents of the project partners and LSG projects on the section. The character and the justification of certain projects pre-identified by the Master Plan will be shown by conducting further analysis and studies, and their implementation will be coordinated with the obtained results.
Justification: The busiest section in the Republic of Croatia and an integral part of the Mediterranean corridor within the TEN-T transport network. It connects the EU corridors with SE Europe and is a key corridor towards Istria and Dalmatia. Identification of key issues relating to regional and local integration, public transport, bottlenecks, environmental issues and creating preconditions for strengthening the economy by adapting to the needs and LSG projects is expected by the preparation of the Master Plan.
Project implementation
period:
15 November 2014 to 30 September 2017
Estimated value of services for the preparation of the Master Plan for the development of transport infrastructure on the Zagreb - Karlovac motorway section: 1,606,500.00 (VAT excluded)
Contractors: BalCon Consulting Kft., TURA-TERV Mérnöki Iroda Kft, PNZ svetovanje projektiranje d.o.o. i Bomega Usluge d.o.o.
Contracted amount of advisory services in the implementation of the preparation of the Master Plan for the development of transport infrastructure on the Zagreb - Karlovac motorway section: 152,000.00 (VAT excluded)
Contractor: EU projects - consulting and other services
Co-financing: The project is co-financed by the European Union (with 85% of the project value) from the European Regional Development Fund through the Operational Programme Transport 2007- 2013. 15 percent of the project value will be co-financed by Autocesta Rijeka-Zagreb d.d. with partners Zagrebačka County, Town of Karlovac, Town of Jastrebarsko, Municipality of Klinča Sela and Municipality of Stupnik.
Contact person for
additional information:
Sanjin-Velebit Pešut
Telephone no.: +385 1 6515 360
E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Useful links: www.strukturnifondovi.hr
www.mppi.hr
www.promet-eufondovi.hr

Traffic On Motorway

 ON DATE 15.10.2019 at 06:36

A1
Zagreb/Lučko - jctn. Karlovac
  • Regularly, dry roadway
A1
jctn. Karlovac - jctn. Bosiljevo 2
  • Regularly, dry roadway
A6
jctn. Bosiljevo 2 - jctn. Kikovica
  • Regularly, dry roadway
A6
jctn. Kikovica - Rijeka/jctn. Orehovica
  • Regularly, dry roadway
A7
jctn. Orehovica - jctn. Diračje
  • Regularly, dry roadway
A7
GP Rupa - jctn. Diračje
  • Regularly, dry roadway
D102
Krk Bridge
  • Regularly, dry roadway
 

Traffic in Croatia

ON DATE 15.10.2019 at 06:30

more info...