Hrvatski
USERS CORNER
 Passage Overview
 Account Balance
 QUESTIONNAIRE
 FAQ
 more... 
SECTIONS
  Rijeka - Zagreb Motorway
  Orehovica - Čavle
  Čavle - Kikovica
  Kikovica - Oštrovica
  Oštrovica - Vrata
  Vrata - Delnice
  Delnice - Ravna Gora
  Ravna Gora - Vrbovsko
  Vrbovsko - Bosiljevo II
  Bosiljevo II - Bosiljevo I
  Bosiljevo I - Novigrad
  Novigrad - Karlovac
  Karlovac - Jastrebarsko
  Jastrebarsko - D. Zdenčina
  D. Zdenčina - Lučko
  Rupa - Križišće Motorway
  Rupa - Matulji
  Orehovica - Sv.Kuzam
  Rijeka bypass
  Riječka obilaznica
  Krk Bridge
  Most Krk
about us tolls information rest areas sustainability tenders
Rijeka bypass
section: Riječka obilaznica 11.89 km
section Riječka obilaznica
The Rijeka Bypass is located on the section from the Matulji Interchange to the Orehovica Interchange. The part from Matulji to Diračje is constructed as dual carriageway, 3.05 km long, and the part from Diračje Interchange to the Orehovica Interchange as a single carriageway, 8.856 km long (southern Rijeka Bypass carriageway).

Construction works on the southern Rijeka Bypass carriageway began in January 2008 and consist of:
  • Upgrade of the main alignment with the south carriageway connections to the constructed sections at the Diračje and Orehovica Interchanges, Diračje and Orehovica Interchange upgrade, Rujevica Interchange construction, drainage of the alignment and intersections’ drainage, construction works for the cable canalization and noise protection wall (l=14.021 m), construction of retarding basins Podmurvice I and II, Krnjevo II and III.
  • Construction of structures: Rječina Bridge, Katarina and Mihačeva Draga Viaducts, Škurinje Underpass, Kozala Overpass (upgrade) and the overpass at the Škurinje Interchange, pedestrian overpass Malonji and Vrhovo improvement
  • Construction works in Trsat, Katarina, Škurinje I and Škurinje II Tunnels

Almost 30% of works of overall section’s length which is 8.856 km, refers to construction of structures:
  • four tunnels: Trsat (858 m), Katarina (190 m), Škurinje I (412 m), Škurinje II (560 m)
  • two viaducts and bridge: Katarina Viaduct (112 m), Mihačeva Draga Viaduct (189 m), Rječina Bridge (208,5 m)
  • two overpasses and one underpass: Kozala Underpass (55 m), overpass at the Rujevica Interchange (29 m), underpass at the Škurinje Interchange (30 m)
Overall length of tunnels is 2.020 m, 509.5 m refers to big structures (bridge, viaducts), and 114 m refers to smaller structures (overpasses, underpass).
TRAFFIC ON MOTORWAY
  on date 07.09.2010 at 23:01
07-2307 
A1: Zagreb/Lučko - jctn. Bosiljevo 2
  • Medium traffic intensity
A6: jctn. Bosiljevo 2 - jctn. Kikovica
  • Weak traffic intensity
B6: jctn. Kikovica - Rijeka/jctn. Orehovica
  • Medium traffic intensity
RI.BYPASS: Orehovica - jctn. Diračje
  • Medium traffic intensity
A7: GP Rupa - jctn. Diračje
  • Medium traffic intensity
D102: Krk Bridge
  • Weak traffic intensity
TRAFFIC IN CROATIA
  on date 07.09.2010 at 20:03
08-0230 
Due to a traffic accident, which happened at the 234th km of A3 Bregana-Lipovac motorway, at Sredanci rest area in direction Lipovac only one road lane is free.
 more info... 
WEATHER FORECAST
  for Croatia on 07.09.2010.
08-0205 
Not applicable.
 more info... 
toll-free phone 0800 0111 home about us sections tolls information rest areas sustainability tenders contact